6. Standard Pitch
Time (S.P.T) = Basic Pitch Time (B.P.T) + Allowances (%)
7. GSD
GSD = (Man power * Work hour) / Target
8. SMV
SMV = Basic time + (Basic time * Allowance)
9. Basic time
Basic time = Observed time * Rating
10. Observed time
Observed time = Total Cycle time / No of cycle
11. Rating
Rating = (Observed Rating * Standard rating) / Standard rating
12. Earn minute
Earn minute = No of Pc’s (Production) * Garments SMV
13. Available minute
Available minute = Work hour * Manpower
14. Organization Efficiency
Organization Efficiency = (Basic pis time / Bottle neck time) * 100
15. Basic pis time (BPT)
Basic pis time = Total GMT SMV / Total Manpower
16. UCL
UCL = Basic pis time / Organization Efficiency
17. LCL
LCL = 2 * Basic pis time – UCL
18. Capacity
Capacity = 60 / Capacity time in minute
19. Cycle Time
Cycle Time = 60 / Team target
20. Capacity Achievable
Capacity Achievable = Capacity * Balance
21. Daily output
Daily output = Work hour / SMV
22. Factory capacity
Factory capacity = (Work hour / SMV) * Total worker * Working day * Efficiency
23. CPM
CPM = (Total over head cost of the month / No of SMV earners Work minutes)
*Efficiency
24. Required no of operator
Required no of operator = Target daily output / Daily output per operator
25. Efficiency
Efficiency = (Earn minute * Available minute) * 100